Monday, 17 August 2009

Miniature Monolith & Rabbit Stew

The weekend began with a trip out to the block to do some more work on the fence for the orchard area. I had thought there were only two posts available from the cattle yard demolition I'd done some time back, but upon arriving out there and surveying the materials stockpile I discovered the third necessary element for the fence. Fantastic news as I now had enough to get straight on with the job, no money needed!

I completed the first two posts before lunch, one next to the concrete post to hang the gate off, and the other further down the hill to form the south-eastern corner of the interim fence. Later on we will have another gate there to let us into what will be the lower front paddock, but at this stage we can just drive around it, so there is no need to expend the extra resources to put in the extra gate.


House Yard Plan. Orchard to the right, with three vege yards for rotating, chooks digging in between. Combined glasshouse/chookhouse planned as well. The gateway in the pictures below is just above the three rectangular yards, on the left.

The new fenceline will enclose the existing route of the "road" from the front gate, so we're shifting that so it runs along the new fenceline. One problem this created was that it ran straight over the top of an outcrop of rather large stones. After some lunch I thought I'd take a break from digging post holes and got stuck into digging out these obstructions, optimistically expecting that it would only take a short while to clear the taller ones out of the way.


Course of the new roadway looking roughly south from the front gate, the white tape is the fenceline and you can see the gateway-to-be down the end.

Sadly it wasn't to be so easy, and three hours later I'd evicted a sizable boulder from the roadway's course. According to some rough calculations it's about 300kg, which is rather heavy. Once I had it out of it's hole I shifted it back up the hill a bit and decided, rather foolishly, to stand it upright as a feature stone in what will one day be the front yard.

The monolith and attendants

Needless to say, once this was done I had serious second thoughts about setting to digging the third post hole needed to finish up the orchard fence outline. Bravery, or more foolhardiness, overcame me and I began digging, to find that the ground in the spot that had been chosen (on a map drawn about 70km away in the comfort of home) was soft and easy to dig, and right on top of the remains of an older fence post. Where the other posts had taken about an hour each, this one was planted within half an hour. The gods were certainly looking after me!

I took a quick wander around to see if I could bag a bunny for some stew before heading home, and got lucky again. We'd discussed it that morning and wanted to show the lads how a rabbit is skinned and prepared for the pot, so the unlucky bunny was loaded into the truck for the journey home.

Sunday had been selected as a day to be spent at home on the farmlet, catching up on some of the myriad jobs neglected in the drive to get some things done at the new place. A bit of maintenance fixing the laundry flyscreen door to ensure it latches properly, replacing washers in the bathroom (including an educational exercise for the lads and lots of willing assistance) and then it was out into the yard to skin the rabbit which had been hanging overnight. Eldest turned a bit green and headed off to engage in other pursuits, but mid-twin kept up the questions and was most interested to see what went on inside a rabbit.

Once that was done it was time to tackle the machinery crisis we are facing. Our push mower threw a vital component some time ago, taking with it some other vital components, and was considered well and truly dead. We'd borrowed and picked up a couple of other non-functional mowers that I was sure could be restored to working order. I concentrated on yellow Victa, a stylish, fairly recent (10 years or so?!), model that had all it's parts. After cleaning carbies, spark plugs and flushing fuel tanks the problem was isolated to a blocked muffler. Much banging and soaking and blowing later I was able to get it started and running. I promptly re-assembled all the protective and dress cowlings, and then attempted to start it again, without success. Aaaaaarghh! I'd had enough for the day, so it was relegated to the to-do list, once again.

We sampled the rabbit stew, and it was promptly consigned to the category of dog food. The flavours were interesting enough, but after chewing on the same small piece for a good five minutes and not having any impact upon it it was decided that actually consuming it might turn the kids off rabbit stew for life. Next time we'll have to let the creature rest for a few days perhaps? Might have to do a bit of research into preparing rabbits for the pot, something I should have done it prior to starting out! Needless to say, the bolognaise we had in it's place was very nice...

Tuesday, 11 August 2009

Rough Outlines

If you've ever spent time at the drawing board you'll realise that you start with the rough outlines, and then progress to add in the details. It doesn't matter how many times you're starting over, the process is still roughly the same. We've heard from our certifier, and he's still waiting on a response over the issue of legal access from a planning friend of his, but otherwise the news is good. We can surrender the development consent and get rid of the new conditions, and they can't modify the house consent conditions to add on the things they have put onto the shed.

As long as we can proceed with building the shed under exempt development we can take this course of action. Once again it's back to the intersection and stock grids, but that's better than the alternative. We've gone to the Ombudsman as well, following on from the suggestion from Andrew and Heather of Tenderbreak Permaculture Farm. We haven't heard back from them yet, I imagine the wheels of power turn at about the same pace no matter where up the ladder they are situated, and I don't hold out a lot of hope, but it's a good feeling all the same, to know that we've told someone in power about the kind of professionalism that comes out of our Council.

This weekend just gone I actually got to spend two whole days out at the block. It was beautiful. Satuday was spent felling a rather large dead tree that was situated smack bang in the middle of the future orchard, and because the rest of the family was there as well we all went for a walk down to the creek, then up the rocky hill and back towards home base.

On the way back there was a little experience that just goes to prove that you're never too old to lack common sense. We found an old wheel laying in the grass up the top of the hill, the tyre still in serviceable condition, so it occurred to me that it would be wonderfully amusing to show the kids how it rolled down the hill. Once everyone was suitably gathered and attentive the wheel was set free. It rolled off with enthusiasm, and about 50m into it's journey I took the time to consider where it was headed, with some prompting from the DW. Straight toward the boundary fence with the neighbour, a creaky old thing of wooden posts and rusting wire.

Needless to say, I watched in horror (and I must admit a great measure of excitement) as the wheel gained speed on it's journey toward the inevitable collision. It struck and lifted two of the large wooden posts out of the ground as the netting bowed inward, before propelling the wheel back. We watched from the top of the hill as it curved off down toward the creek, completing it's journey in a slow spiral in the flat above the empty dam. Quite a momentous journey, and the kids absolutely loved it, funniest thing they'd seen all week!

The big strainer, and remains of the big tree

They all departed about 3pm, leaving me to finish up a bit of wood cutting, and to put in the big concrete strainer post that was going to help form up the orchard fence. That was a mighty traumatic job, luckily the neighbour came by and lent me a hand getting it up and into the hole. After that it was getting dark, so off home.

The next day started with a trip to the FIL's to pick up some old apple bins, as I'd packed the four remaining oak trees in the truck and intended to finish planting them out. With 6 bins loaded up I headed back out to the block, and started the day with some tree planting. The afternoon was then spent chopping up more of the newly felled tree, and after struggling to drag the wire rope back up the hill to pack it away I was well and truly done for the day.

The Oak Grove, with 5 oaks in bins

Back on the farmlet, our neighbours had acquired a couple of ducks that they then discovered were a bit large to be pets for their grandson, so we were called up and asked whether we wanted them. The DW was very enthusiastic and the appropriate arrangements were made. Yesterday we became the proud owners of a breeding pair of Indian Runner ducks!

Tuesday, 28 July 2009

Back to the Drawing Board

We seem be to going around in circles at the Farmlet at the moment, which I imagine must be a bit frustrating for you who take the time to read this. Unfortunately that's the sorry tale that is to be told, so unless I choose to say nothing at all, it's what you get ;-)

As a bit of a test I called up the Council yesterday to challenge them about the need for 50m of RG2 roadway connected to the intersection. Council's policies (I should point out that they are new policies only accepted by Council back in May) state that the old RG1 standard of single lane gravel road is now non-existent, except for right-of-way situations serving only an average of 16 vehicle movements per day. The result of the conversation was as useful as I'd expected. I was told that for each allotment the average was 8 movements per day, how people would use 8 vehicle movements per day I don't know, some people obviously drive way to much! Even if we dropped the kids off and picked them up from school that's only 4 movements per day, and living in the country if you drive out to drop the kids off then you keep on going if you need to. As there were two allotments up our lane (and it seems we have to pay for both of them) this equates to 16 movements in total, and the RG1 standard was only applicable for less than 16.

I tossed and turned last night rather than sleeping, and then realised just after midnight that the Council offers a 2 movement discount to encourage development. Silly me for missing that in our conversation.

First thing this morning I called up a business that does road building to get a ballpark figure on how much the roadworks were going to cost. At the end of it we arrived at about fifteen thousand dollars to do the upgrade (yes, $15,000) all of which should have been levied on the guy doing the subdivision. Strangely, all of which was levied on the guy doing the subdivision, and was passed on to us in the purchase price. Hence our extreme reluctance to spend more money on it. But I'm getting the distinct impression that Council aren't overly concerned about spending our money for us.

I called the Council guy back again after finding out this sum, but was directed to voicemail. I'm figuring that the calling number display alerts them to the fact that it's me so they avoid taking the call now. I left a message outlining the reason for the call, particularly to discuss the fact that he hadn't taken into account our supposed discount, and indicating that I would like a call back to discuss the issue.

After much discussion with DW we came up with a last resort plan. I don't expect the response from Council to be positive. It hasn't been to date, and even the most positive things have carried with them heavy burdens in the way of additional conditions, typically to make up for all the stuff they forgot in previous versions. There's a special brand of ineptitude being cultivated up there.

So our cunning plan is to ditch the shed development consent and to build the shed under the new NSW exempt development rules. The certifier was pretty certain that Council's idea of legal access to the block was flawed and that the current state of the access shouldn't hinder building under those rules.

This eliminates all of the conditions that have been applied to the shed, including the road upgrade. We then fall back to the conditions on the original house consent which included the stock grids and the BAR/BAL intersection. I'm guesstimating that more than half of the cost of the works would be tied up in the 50m of roadway, so for roughly $7,000 we should be able to upgrade the intersection. Another $6,000 for putting in the stock grids, and we arrive at a total of $14,000 of work.

Sure, that looks pretty close to the other number, give or take a thousand.

Did I neglect to mention that in addition to the road upgrade we also needed to fence off the road reserve? I've estimated that at $5,000 odd dollars for materials, so the total for upgrading the road and fencing would be (conservatively) around $20,000. This way it stops at $14,000.

An additional benefit would be the scrapping of the new condition that was applied to the house consent (which is a dubiously legal condition at best, so I've been informed), which required that we do the roadworks before pouring the footings on the house. Under this new plan (which is a lot like the old one) we can do most of the house before having to worry about roadworks.

So I keyed a letter off to our certifier to request clarification on all of our understandings and intuitions, and now await a reply from both people. Whilst I wait I'm left to ponder the situation. Perhaps there is something we haven't achieved that we should have, and so we are being sent in circles until that achievement is made? The universe, by way of a friend, was kind enough to supply us with building materials, tools and other goodies on the weekend, so it's still looking after us, there's little doubt about that. There must be other processes in motion, things happening behind the scenes that need to catch up and arrive at a particular point for us to move onward.

So, depending on the answer to my email and phone calls, we might not be proceeding with locating the shed in the spot that we've picked out and done work to clear up. Not such a bad thing perhaps, though I've now got to go back to the drawing board and pick another spot (more than 15m from any boundaries IIRC). Tricky on our hilly country, but as you might have guessed, I don't mind a challenge, though I'd prefer it if it wasn't the same challenge over and over and over again...

Monday, 20 July 2009

Two New Trees

I began the weekend without any real idea of what I was going to get up to. The family is all away on holidays, so I had to take into account that I needed to be around to feed the animals at the FSF, so spending the whole weekend camping at the new block was out of the question. In the end I decided I'd nip out to the block on Saturday and plant a couple of trees and chop some firewood.

Planting trees out there is quite an involved job. Not so simple as digging a hole and bunging the tree in, that's for sure. That's part of it, but once that bits done then it's a matter of preparing an apple bin by removing part of the base so that it can fit neatly over the tree. Then a couple of posts are hammered in around it, and then mesh is strung around the posts. Finally a row of rocks or timber is laid against the two sides of the bin that aren't enclosed all the way to the ground.

The Stone Pine

What all this effort? Well, goats and hares of course. Both would make a quick meal out of the young trees, and at this stage of the game there is no point fencing off large swathes of land for tree planting as we'd never be able to keep up with the maintenance. So for now we're going to stick with a few strategic trees in apple-bin safety systems.

These are the first trees we've planted out there since just after we got the block, when we planted the commemorative oak. The two new trees are placed in strategic positions. Another oak has gone in, this time in the spot that is going to become the oak grove, just down the hill from the house. The other was a stone pine (Pinus pinea) and it went in the spot where we're going to have a grove of, well, stone pines...

They're not much use on their own as poor isolated trees, but they are intended to be symbolic more than practical at this stage. In future, whenever I look at, or wander past those spots I'll be thinking to myself "there's the stone pine grove" and so on. It helps cement the idea and the vision in place in my mind, and that helps make the reality so much easier to create.

The only features that actually exist on this plan are the boundary fences,
and even they're not necessarily in the right place...


Had tea in town on Saturday night with the parent's in-law, and arranged to pick up the next day a load of bent and rusty old star posts that were on offer. When I arrived to do this the stack turned out to be a lot bigger than expected, and there was a concrete strainer thrown in with it, which would have been a bit big to be unloading at home and then reloading to take out another weekend, so Sunday was spent with another drive out to the new block to unload the bounty.

All-in-all a great weekend, though perhaps not as productive as possible given most of it was spent driving around. Seems to be the common theme over the last few months, more time driving than working. Still, with the number of posts gifted to me I should be able to put a fence around the orchard out there, and then some, which gets us that one step closer, and that's always a good thing!

In other news we've got our construction certificate for the shed now, so we can begin whenever we please. Problem being that I've got to go to Sydney this Friday, to return on Saturday arvo, and then will be spending Sunday with the family for the first time in almost two weeks. Maybe I can convince them we need to be catching up over some nice hard digging out on site :-)