Showing posts with label Shed Project. Show all posts
Showing posts with label Shed Project. Show all posts

Tuesday, 15 December 2009

A Finished Shed

Yes, we finally did it. Weekend before last we were able to complete the shed! With help from DW and DM the gutters went up, the roof went on, and and all the final bits and pieces were completed. I can't say it was fun, a day on a glaring and hot roof isn't the most pleasant way to spend time. It's strange, but now, at the end of it all I'm left feeling a bit empty and unsure of where to go next.




That is not helped by some recent bad news. We heard from the accountant who tells us that thanks to some new rules we wont be sharing our partnership income the same way this year, which hands DW a refund, but lands me with a very hefty tax bill, due by March (on top of covering the two BAS statements that come in quick succession early in the new year)

Sadly that was not the end of our woes as the faithful truck sprang a big leak in the radiator on Sunday. Unfortunately I was stuck on the highway with nowhere to pull off for half a kilometre or more, so by the time I rolled to a standstill the cabin was filled with smoke and the temperature guage was maxed out. There was a small bit of luck, having a great friend who just happens to be a diesel fitter, and is well equipped for such adventures. He was able to pull me out of the awkward spot and over the course of the day we got it towed back to his place and then proceeded to pull the head off and see what damage had been done. The initial investigations proved inconclusive, no obvious evidence of damage to the head, so he's getting a second opinion over the next couple of days.

Needless to say it's been a trying week. Last week and the one before I was asking the Universe for a sign, for some direction about where to head with our lives. It's usually pretty good to us, though as with all such things the signs are never clear, but usually enough to go on with. Not sure how to interpret this turn of events at all.

Admittedly some clarity has come out of it. DW is not happy here, or with the new place. It's only marginally moister than the current location, and a fraction of a touch cooler, which isn't enough in the grand scheme of things, factoring in climate change. One of the biggest issues is we're still faced with at least a year of work before we can think of moving onto the block. And that means at least a year before we can think of doing anything much out there, especially to do with larger animals.

So we've discussed our options. One of those options is a move to a better climate with more reliable rain, and a move onto a place that already has a house upon it. That way we can move and start, in one go, just like that, rather than selling one place, moving, building, moving, then starting. Given we're currently supporting two mortgages that would if combined buy us a reasonable place somewhere else, what's not to like about the plan?

Perhaps all this grief over the new block was the Universe trying to give us a sign, and now we're getting a bit of punishment for not listening in the first place? lol! Then again, maybe it's totally the opposite? Aaargh! I'm afraid to ask for more signs so perhaps we will have to soldier on in a state of uncertainty (not that there is ever real certainty).

So, where to now? Christmas holiday plans are pretty well ruined. There'll be no transporting of stuff to the block thanks to the death of the truck (unless by some miracle we can fix it this coming weekend) though there is still plenty of opportunity for cleaning up around the place before the festive season. Beyond that, it's a matter of making a decision and acting upon it. During our conversations the following list of desirable traits in a new property has come up:
  • Only 1 to 1.5 hours from the coast.
  • Plentiful rainfall through the year - median of 800mm plus.
  • General temperature range up to 35 or so.
  • Water, preferably on a river or large perennial creek. Even better if we can float in the tinny all the way to the coast and have the kids row us back after a day of fishing :-)
  • House and sheds.
  • 25+ acres (we figure higher rainfall means better carrying capacity, so we can do more with a smaller amount of land.)
  • Reasonable soil.

Not a lot to wish for, is it now? lol! While we're at it we better wish for people to buy our current properties, otherwise all these plans are coming to a grinding halt before they've even started moving...

All the best for the summer solstice celebrations and/or Christmas!

Thursday, 26 November 2009

Framed!

Well folks, it's been a while... and we've certainly had some "exciting" times since the last post.

The weekend after the last post we were at it again out at the new block. I arrived early but only had a couple of odd jobs to do collecting materials together and getting things organised. Once the crew arrived we got started, and despite a couple of scary moments due to lack of adequately robust bracing we got all the portal frames up and a good number of tophats on to hold it all in place. Thanks to the poor quality screws supplied in the kit we'd run out by late afternoon, having thrown about half of them away.


It was late afternoon when we packed up and headed for home, with Brother M following me back on the scenic drive via Canowindra to enjoy an evening of wine and conversation, and home made pizza, at the basecamp (FSF is basecamp if we consider the goal is ascending Australia's rather flat topography by 300m to the new place...)

The following day was one of rest and recovery, and a fair bit of pottering in the back yard. I also nipped into town to pick up some materials to make potato cages, and to try and protect the nursery stock from the ravages of the guinea pigs. I've resisted potato cages in the past for various reasons, but figured I may as well give them a go and see if we can up production on that front.


The intervening week of work was not very exciting (easy to predict given I can't recall mentioning work here too often) but at least it passed swiftly into the next weekend. I went out alone to the block on the Sunday only to find that disaster had struck.

Once again inadequate bracing and not having all the purlins installed had brought us to the brink of destruction. The Saturday night had seen ferocious winds, which continued through the Sunday, and the shed frame was on quite a lean thanks to one of the support ropes snapping. Thankfully it only took about an hour to straighten everything up and re-anchor it all, then I got started putting the last of the purlins in and sorting out some of the mistakes I'd made along the way. In the intervening week I'd splurged on a tek screw gun (so much for simple living!), and bought a big box of real tekscrews. Failure rate is less than 1:10 now, which makes the job a whole lot easier.

By Sunday afternoon, and not too late at that, the shed frame was completed, and anchored a bit more firmly than before. Let's hope it's still standing this Saturday when it's time to start putting some cladding on it. Getting close to completion now!

Once the shed is complete we can clear this place out and really get moving!!


The heat has been taking it's toll in the garden, and DW thinks that mice are also getting into things. Not sure how we're going to deal with that one, the indoor cat is not going to be allowed out for that job. We had trapped the guinea pigs too, but they managed to escape again, so we're back to square one. Ducklings and chooklings are all powering along, it won't be long before we've got to organise accommodation for them all. Speaking of which, we'd better do the same out at the new block before too long. I seriously doubt anyone is going to let us rent and bring along twenty-odd chooks and 9 ducks...

Tuesday, 10 November 2009

Attempt Number 2

The weekend before last was our first attempt at erecting the shed frame, and let me tell you, it was something of a disaster. I arrived out on site nice and early and got started preparing things. It was the first time I'd loaded the generator onto the truck to take out there, so there was a fair bit of screwing things together to be done before everyone started to arrive at 10am.

Things went well for the first hour, then trouble struck in the form of a generator that ran erratically, allowing at most one screw to be placed before it went off into a flurry of stuttering that prevented anything but hair pulling.

A quick call to Dad who was on his way through Bathurst and I'd arranged for him to purchase one of the cheap and nasty generators from the local big-box hardware stores. The hire company was shut over the weekend, and other loan options were hours away, so the only option was to purchase if we were to salvage anything from the event.

Everyone had arrived by the appointed time, and we got the new generator out and set up, then commenced installing the first frame. All appeared to be going reasonably well (with the exception of a number of missed steps thanks to the panic induced by the loss of the generator, something I was to discover later) but for a few organisational issues. Once that frame was up we started screwing the braces to the second frame and the drill stopped working. Thinking that we'd be smart and put one of the cordless drills on to charge whilst we figured out what to do about the dead drill and we came to realise that the second, new, generator had also failed.

Unbelievable! We tried a few things to get either of them back up and running correctly and ended up sorely disappointed. In the end we unbolted the frame we'd already erected and packed everything up then went for a drive around the place to show Dad, who was experiencing his inaugural visit.

The old generator was in the workshop the next week, the new one is sitting back in it's box waiting to be returned. On Friday I got the call that the generator was ready to be picked up, so I made arrangements to collect it Saturday morning. They gave me the sad news that it was making some strange noises and might not have long to live. My fingers are firmly crossed that it makes it through the next couple of weeks to get the shed finished.

Sunday was spent out at the block again, finishing all of the preparation work that had been neglected in the panic the previous weekend. This time around everything is pretty much ready to go, so it should be a matter of erecting the frames and stitching them together with the tophats. Sounds easy enough on virtual paper, but the experiences of the last attempt have shown me that things don't always go according to plan. I'll let you all know sometime next week how things went!!

Back on the home front, we've now got 11 new oak trees sprouted, and just over a dozen tallow trees. I was able to collect a lot more seed a couple of weeks ago, so as soon as the toilet roll collection is large enough I'll put in another big batch of those.

The baby chickens are growing at an alarming rate, and eating to match, and yesterday we hatched eight out of twelve duck eggs that we've had in the incubator. Some were reluctant to leave their eggs so DW helped them along a bit, but they don't seem any worse for it.

We've planted out the first batch of tomato, zucchini, melons and pumpkins from the glasshouse, though some of the tomatoes are a bit worse for wear (ie dead) as the couple of days after planting got rather warm. I'd tried planting the tommies into half toilet rolls this year, thinking to save on potting mix, but it seems they needed to be potted on anyway so I've exchanged the extra potting mix for stunted plants that keel over when the sun comes from behind a cloud. All is not lost of course, but we'll be a bit behind for tomatoes this year.

We've also got an unusual problem in the strawberry patch. It seems the feral guinea pigs, currently living under the stack of timber in the carport have discovered the patch, and make daily excursions there to feast on the bounty. Time to trap the little fellows and return them to confinement I reckon.

Monday, 26 October 2009

Rain, Rain Don't Go Away, Just Change Your Day!

There was a spell of nice warm weather there for about a week, and even our trip to Sydney took place in perfect conditions, but I was left wondering at the irony of life when Sunday morning dawned miserable and wet. Whilst we do need as much rain as we can get scheduling it during the week would be a bit more considerate.

After spending about an hour trying to decide whether to venture out in the rain and get the shed started, or to stay in and potter about under cover, getting a start on the shed won out and I loaded up in the wet to go over to the block. It was dry, though still cloudy and threatening rain, from about half way there, so I allowed myself a little hope that it would remain so for long enough to get the portal frames bolted together.

Four finished frames

About twenty minutes after arriving, having sorted out the materials and just teetering on the cusp of getting started the rain began, and didn't let up until half an hour before I reached the end of the work. Of course it remained sunny for the rest of the afternoon and didn't start raining again until the evening. Funny that!

Whilst it was wet I still managed to get the frames bolted together, now they're all resting waiting for next weekend. I've got a small crew together to help out with putting them up, so as long as the weather is nice we should have the worst part of the job over by this time next week. I don't enjoy trying to get things square, level, parallel and in tune with the environment, it takes a lot of fiddling and back and forth measuring and adjusting. I certainly appreciate the need for it, but I can't bring myself to find any joy in it, it's a frustrating job of push-me-pull-me, inching slightly closer to perfection until a slip shifts the whole lot out of place and demands we begin all over again. I should stop now or I'll talk myself out of the project LOL!

Back on the home front the Chinese Tallow seeds I put in a while back have all started to sprout, eleven of them are pushing up above the soil. I had to collect the boys from school last week, so grabbed another pocket full of them. I'd despaired of finding any after searching the Orange cemetary for the trees that had been there many years ago, but failing to find them, and was most pleased to find that there were three trees right outside the kid's school gate. Talk about having your eyes painted on...

Chinese Tallow trees, future bio-diesel plantation

We've also got a lot of cuttings in the glasshouse that are coming along well enough, and as long as this latest spell of wet weather doesn't bring the frosts back we should be able to start planting out the tomatoes and other frost sensitive vegetables which are growing nicely in the warmth. Outside in the greenhouse areas we've got 9 lovely new oaks coming up (we're going to have one big oak grove out there!) and all the other stuff is growing nicely, even after being trashed by the chooks on Saturday. We'll need to pot a lot of stuff on for the season as there is no point trying to plant it out now with the heat of summer to come (if indeed it does...) so we've got a bit of work to do there. It will save us a bit of time in the end as the worst of the pot-bound plants are needing water every day now.

The new oaks and a couple of pots of weeds saved from last year...

The duck eggs in the incubator should hatch in two short weeks, and as you can see below the silky chooks we hatched out are growing swiftly (though not 'big-ly')

Four of the new chooks.

Monday, 19 October 2009

Founded

It's official, sort of! The first ever permanent construction (or part thereof) has been completed out at the new block. It was a tight race to the finish, with just enough material available to finish off the last hole for the footings, and it's all done.

We could commence construction of the shed next weekend, as that will have allowed the required 7 days of curing, but we're off to Sydney for a day to visit family, so apart from bolting a few of the portal frames together it might be a matter of spending time tidying up the site and getting the "floor" levelled. I don't fancy getting half way through putting the frame up and having to leave it for a week, it would only take one decent storm to lose the lot... Patience will prevail and I'll get as much prepared as possible for the following weekend, and I'll even draft in some helpers to get the critical elements up as swiftly as possible. Better make sure the generator works as well, sometime between now and then.

Seems like we're coming out of the winter weather at last, the recent rainy spell didn't result in the severe frosts that earlier ones brought trailing along, so it might be time to plant out the tender vegetables soon. Certainly hope so!

We've hatched out 8 new chicks in the incubator, then a few more for another friend, and we've now got some of the Indian Runners on the go which are progressing well. We're going to have to look into finding a new male from somewhere if we hope to breed any more of them up to avoid inbreeding problems, especially as we have no idea whether the current ones are closely related or not.

The DW has put on a test batch of lilac wine, whilst we wait in eager anticipation for the elderflower harvest to begin. Shouldn't be long now! We're going with champagne yeast following some good advice, we'll be sure to let you know how it goes.

Anyhow, I'm off to enjoy some of the Daylight Savings inspired after-work sunshine. I'll try and get some pictures for next time, all this text must be hard on the eyes!

Monday, 21 September 2009

On Even Ground

It has finally begun, after all these long months we now have a level shed site, and therefore an official start on the shed construction.

Early Saturday morning I was finishing up packing a load to take out there when DW informed me that she'd just taken a call from our neighbour to let us know he'd be doing the work that very day once I made it out there. I rushed through the rest of the packing (without forgetting anything this time, last time I forgot the thermos, it was still sitting on the bench when morning coffee time arrived...) and made it over there in good time. After unpacking the load of stuff he arrived and we set about deciding on the best approach. Shortly after that the bulldozer roared to life and he was off and ripping.

After ripping, the first loads of dirt are pushed around.

Thankfully there were only a couple of patches of stone in the spot we'd selected. In other areas there are great reefs of stone sticking out of the earth, and finding one of those would have brought the project to a standstill. There were a number of adjustments made through the day, but before sunset it was done.

All done! The water level featured in an earlier post came in very handy.

I'll need to let the earth settle for a couple of weeks, so weekend after this next one I should be able to begin laying the shed out and digging the holes for the footings. Once they're dug it's time to grab the cement mixer, get a load of concrete mix and start filling the holes. When they've cured the rest of the project should go up quickly.

I'd been keeping myself occupied during the day working on the southern fence for the new orchard, and managed to get the netting up before dark. I'm going to save doing the barbed wire on all of the runs until last, seeing as it's the most exciting part of fencing.... not! Only one side to go on that project and we've got a fenced off orchard out there. Combine that with a tank on the shed and we can start planting this autumn (if not a couple beforehand).

The new orchard's southern fence.

On the home front there was great excitement in the house this morning at the sound of cheeping chicks. We'd tried incubating our own eggs a month ago, but nothing came of it, seems we have yet another dud rooster. We got a few eggs of some mixed bantam breed and put those in, and this morning we have six new chicks!!

The vegetable garden is powering along, as are the seedlings in the glasshouse, and there's only a few trees that haven't flowered yet. Sadly most of the almonds on the older tree are gone already. The parrots have a habit of nibbling all the flowers off and dropping them on the ground. If only they had the forethought to hold off nibbling early then they could come back later and get the fully grown almonds. Seems it's not only humans who don't have the sense to think about the future :-P

Monday, 14 September 2009

The Madness Continues

It's been a very busy couple of weeks around the place! Between work and play-work there hasn't been a lot of time for much else, but over the weekend I managed to take a few pictures so that you can see what we've been up to, as well as reading the usual verbiage...

The toilet roll seedlings

We did make it out camping, and a great weekend it was. Started out a little windy, but shortly after erecting a screen of tarps to reduce the worst of it it all died down. The night was incredibly cold, and we woke to a thick frost and a case of the shivers which took a while by the fire to subside (I'm sure it wasn't totally due to the wine consumed the night before, the frost must have been partly to blame!) In addition to a long and leisurely walk to the creek we did a bit of digging in the crystal mines and found a few nice specimens, though nothing truly remarkable.

Before leaving we also marked out the new spot for the shed so that the neighbour will be able to pop over whenever he has the time and inclination and level the site for us. The location isn't quite as good as the last with regard to preserving the views, but it shouldn't do too much harm. At the very least it will divide it up into "garden rooms" with framed views lol!

Chooks on patrol

This Saturday just gone I took off out there again, though it was a slow start and I didn't make it out there until 11am. A good part of the early morning was spent welding two pipes into one longer one that was going to be the final stay for the eastern fence of the orchard. I'll admit now that I need a lot of catchup practice on the welding...

The stay went in swiftly upon arrival, so I dove into putting that fence up, being the longest and most daunting. It's only 50m long, but still daunting, so I hate to think what some of the longer ones at 200 - 300 m long will be like, though I might be able to take a few days for them. I had planned to tie salvaged chicken mesh over the top of the hingejoint to stop the goats from getting themselves stuck but pulling the mesh out of the dump turned out to be a whole lot more complicated than I'd anticipated. I ended up wiring the remaining portion of a roll of foot netting over the bigger holes where they usually run into trouble, and finished up the rest with more hingejoint offset enough so the holes are now too small to fit a goat head. I've now only got the 18m and the 30m sides to go. I'm thinking I may need to fork out the money for a roll of netting, though I'm going to try pulling the mesh out of the dump with a winch first.

The eastern fence

I also had a chance to speak to the neighbour, and he thinks he'll be up to do the shed site shortly. Fingers crossed it might be ready for next weekend, then we can begin the joy of digging the holes for the footings! Can't wait!

Spent Sunday getting back into cleaning the farmlet up. As long-time sufferers of this blog may know we were hoping to go on the local market in Spring, which is now here... Still a bit behind that schedule.

Started the day out fixing the front fence up so that it looked more neat, and contemplated the fence that needed to be cut to get the sewer through, and gave up thoughts of trying to repair it after the adventures with the other one (short lengths don't strain well... even after many years of trying) I think we'll get some lengths of pig mesh or sheep yard mesh and make a solid fence that way.

Following fencing we went to the local Show for a while. The kids had a ride on a pony, a few zooms down the jumping-castle cross slippery dip, a browse through the exhibits for the competitions, and a look at the four-odd specimens of poultry entered this year, and the various goats, sheep and cattle. After that it was a jump on a different castle, a dagwood dog each, and then a sit-down in the shade while they judged the junior show princesses and jackaroos, and then held a fashion parade. A choc-top each, which required a fair bit of cleaning up afterward, and we judged the show experience complete for another year, so set off back home.

Orchard in bloom.

A delightful (27 degree) afternoon was spent compiling a load of rubbish for the tip, which was carted off, and then trying to hide the greater amount of stuff that I brought back with me. I'm now the proud owner of a good stack of short pieces of corrugated & colourbond roofing, and a weighty pile of star picket pieces in various lengths. The roofing will be ideal for chook sheds and similar projects, and the old star pickets will be great to cut down for stakes for building garden edging. A most profitable excursion! Rather than unload all that lot I started adding to it all of the remaining outdoor goods that can safely live outside over at the new place, which further helped to clean the place up.

We've decided that as soon as we have the shed built we're going to market, we're not going to worry about the millions of jobs that we could complete in order to try and get a better price. we'd end up staying here forever! If we're going into a rental next then we need a place to store everything, so the shed is a priority, but once that's done, no more excuses!! So maybe there is only 3 or 4 weeks to go? Maybe...

Tuesday, 1 September 2009

Spring Madness

It's been a while since the last post, busy and exciting times in the lead-up to spring. Last I checked in we'd done some initial work on the new orchard. This has moved along a little bit further, we've got the stays in on two of the posts (major achievement, I know, but we did do some other stuff as well). I'll need to weld a couple more up for the other three posts, then it will be time for some wire.

We spent a great family day out at the block weekend before last, cooked some sausages over the fire and took a leisurely walk down to the creek and then back via the big hill, with a stop-over at the old dump where we scrounged up some interesting bits and pieces.

The seeds for spring also went in that weekend, a variety of things planted up in toilet roll tubes. Only the basil and cucumbers have emerged so far, fingers are crossed for the rest as some of the seed is getting on a bit, highlighting the need to rotate seed more often. The problem faced there is that some types of seed have so much in a pack one could never get through it all before it declines in viability. Might be worth establishing a seed trade network for the spring flush, where half packets of varieties are sent off about the place. A much better approach than planting a tray of four year old seed and losing two weeks waiting for it to fail to germinate.

Last weekend started out rainy and miserable, with patches of sunshine, so after a quick trip out to the block to pick up some firewood we took a trip into town to do some shopping. I'd been working on two old lawnmowers for the last few weeks, trying to get them running reliably, but in the face of wifely displeasure at the ever lengthening lawn and the lack of suitable parts it was decided that a new mower would be the safest course of action. I've had a lot of lawnmowers over the years, but thinking back on it this is only the second one we have ever bought, and the first ever push-mower. The first purchased was the trusty old ride-on we got when we moved out here. Fifteen odd years of patching up and holding together with wishes various old pieces of junk has come to an end and we are now the proud owners of a new mower.

Sunday started out with assembling the new mower and taking it for a quick test run (the lawn was still wet from the rain overnight, and we all know mowing wet grass is bad news). This was followed up with some remedial work demolishing the old septic tank and filling it in, along with the addition of a few bags of lime. Yes, you guessed it, yet another milestone. The Flood Street Farmlet is officially connected to the Cudal Sewer!! No more swampy side paddock in the depths of winter when DW has put one load of washing too many through. No more glorious unsavory smells to chew upon during balmy summer evenings.

Once I was sure I'd survived filling in the tank (the sides of it were foot thick concrete made in the old style, without reo, but virtually indestructible to the tools of a mere mortal. The small sledgehammer is a ruin, swinging the large one almost killed me) it was time to clear out the old tin shed, and repair the door. By mid afternoon I had the truck loaded up with more 'materials' to go out to the block, another pile destined for the tip, and the shed had been updated with a hinged door in place of the sliding one that refused to slide. It's now the home for the bikes so that there is enough room for shiny new mower in the big shed. Amazing what a fellow can achieve when the safety of his new mower is at stake.

The letters to officially surrender our shed DA were sent today. That should eliminate all the fancy roadwork requirements, bringing us back to square one, an intersection and stock grids on the laneway. I'm not sure how we'll tackle those, but we'll find a way. The shed will go up under the exempt development code in a different location. I was lucky enough to talk to a member of the Department of Planning last week, and a member of the Department of Lands just before that, and neither could see any validity in Council's claim that we did not have legal access to the block. Given that, we're willing to try our luck and if Council decides to get stroppy about it we can meet them in court over it. As always, if we knew then what we know now, well...

This weekend, if all goes well, is camping time. It's DS1's birthday and Father's Day and calls for a weekend of celebration. Fingers are firmly crossed for some nice weather so we're allowed to go! Hopefully we can spend Father's Day doing some of the things I love, like preparing shed sites and installing fences!! If we do make it out then it's guaranteed we'll enjoy a quiet evening around the bonfire with a glass of red or three, the perfect cure for the hassals of modern bureaucracy.

Tuesday, 11 August 2009

Rough Outlines

If you've ever spent time at the drawing board you'll realise that you start with the rough outlines, and then progress to add in the details. It doesn't matter how many times you're starting over, the process is still roughly the same. We've heard from our certifier, and he's still waiting on a response over the issue of legal access from a planning friend of his, but otherwise the news is good. We can surrender the development consent and get rid of the new conditions, and they can't modify the house consent conditions to add on the things they have put onto the shed.

As long as we can proceed with building the shed under exempt development we can take this course of action. Once again it's back to the intersection and stock grids, but that's better than the alternative. We've gone to the Ombudsman as well, following on from the suggestion from Andrew and Heather of Tenderbreak Permaculture Farm. We haven't heard back from them yet, I imagine the wheels of power turn at about the same pace no matter where up the ladder they are situated, and I don't hold out a lot of hope, but it's a good feeling all the same, to know that we've told someone in power about the kind of professionalism that comes out of our Council.

This weekend just gone I actually got to spend two whole days out at the block. It was beautiful. Satuday was spent felling a rather large dead tree that was situated smack bang in the middle of the future orchard, and because the rest of the family was there as well we all went for a walk down to the creek, then up the rocky hill and back towards home base.

On the way back there was a little experience that just goes to prove that you're never too old to lack common sense. We found an old wheel laying in the grass up the top of the hill, the tyre still in serviceable condition, so it occurred to me that it would be wonderfully amusing to show the kids how it rolled down the hill. Once everyone was suitably gathered and attentive the wheel was set free. It rolled off with enthusiasm, and about 50m into it's journey I took the time to consider where it was headed, with some prompting from the DW. Straight toward the boundary fence with the neighbour, a creaky old thing of wooden posts and rusting wire.

Needless to say, I watched in horror (and I must admit a great measure of excitement) as the wheel gained speed on it's journey toward the inevitable collision. It struck and lifted two of the large wooden posts out of the ground as the netting bowed inward, before propelling the wheel back. We watched from the top of the hill as it curved off down toward the creek, completing it's journey in a slow spiral in the flat above the empty dam. Quite a momentous journey, and the kids absolutely loved it, funniest thing they'd seen all week!

The big strainer, and remains of the big tree

They all departed about 3pm, leaving me to finish up a bit of wood cutting, and to put in the big concrete strainer post that was going to help form up the orchard fence. That was a mighty traumatic job, luckily the neighbour came by and lent me a hand getting it up and into the hole. After that it was getting dark, so off home.

The next day started with a trip to the FIL's to pick up some old apple bins, as I'd packed the four remaining oak trees in the truck and intended to finish planting them out. With 6 bins loaded up I headed back out to the block, and started the day with some tree planting. The afternoon was then spent chopping up more of the newly felled tree, and after struggling to drag the wire rope back up the hill to pack it away I was well and truly done for the day.

The Oak Grove, with 5 oaks in bins

Back on the farmlet, our neighbours had acquired a couple of ducks that they then discovered were a bit large to be pets for their grandson, so we were called up and asked whether we wanted them. The DW was very enthusiastic and the appropriate arrangements were made. Yesterday we became the proud owners of a breeding pair of Indian Runner ducks!

Tuesday, 28 July 2009

Back to the Drawing Board

We seem be to going around in circles at the Farmlet at the moment, which I imagine must be a bit frustrating for you who take the time to read this. Unfortunately that's the sorry tale that is to be told, so unless I choose to say nothing at all, it's what you get ;-)

As a bit of a test I called up the Council yesterday to challenge them about the need for 50m of RG2 roadway connected to the intersection. Council's policies (I should point out that they are new policies only accepted by Council back in May) state that the old RG1 standard of single lane gravel road is now non-existent, except for right-of-way situations serving only an average of 16 vehicle movements per day. The result of the conversation was as useful as I'd expected. I was told that for each allotment the average was 8 movements per day, how people would use 8 vehicle movements per day I don't know, some people obviously drive way to much! Even if we dropped the kids off and picked them up from school that's only 4 movements per day, and living in the country if you drive out to drop the kids off then you keep on going if you need to. As there were two allotments up our lane (and it seems we have to pay for both of them) this equates to 16 movements in total, and the RG1 standard was only applicable for less than 16.

I tossed and turned last night rather than sleeping, and then realised just after midnight that the Council offers a 2 movement discount to encourage development. Silly me for missing that in our conversation.

First thing this morning I called up a business that does road building to get a ballpark figure on how much the roadworks were going to cost. At the end of it we arrived at about fifteen thousand dollars to do the upgrade (yes, $15,000) all of which should have been levied on the guy doing the subdivision. Strangely, all of which was levied on the guy doing the subdivision, and was passed on to us in the purchase price. Hence our extreme reluctance to spend more money on it. But I'm getting the distinct impression that Council aren't overly concerned about spending our money for us.

I called the Council guy back again after finding out this sum, but was directed to voicemail. I'm figuring that the calling number display alerts them to the fact that it's me so they avoid taking the call now. I left a message outlining the reason for the call, particularly to discuss the fact that he hadn't taken into account our supposed discount, and indicating that I would like a call back to discuss the issue.

After much discussion with DW we came up with a last resort plan. I don't expect the response from Council to be positive. It hasn't been to date, and even the most positive things have carried with them heavy burdens in the way of additional conditions, typically to make up for all the stuff they forgot in previous versions. There's a special brand of ineptitude being cultivated up there.

So our cunning plan is to ditch the shed development consent and to build the shed under the new NSW exempt development rules. The certifier was pretty certain that Council's idea of legal access to the block was flawed and that the current state of the access shouldn't hinder building under those rules.

This eliminates all of the conditions that have been applied to the shed, including the road upgrade. We then fall back to the conditions on the original house consent which included the stock grids and the BAR/BAL intersection. I'm guesstimating that more than half of the cost of the works would be tied up in the 50m of roadway, so for roughly $7,000 we should be able to upgrade the intersection. Another $6,000 for putting in the stock grids, and we arrive at a total of $14,000 of work.

Sure, that looks pretty close to the other number, give or take a thousand.

Did I neglect to mention that in addition to the road upgrade we also needed to fence off the road reserve? I've estimated that at $5,000 odd dollars for materials, so the total for upgrading the road and fencing would be (conservatively) around $20,000. This way it stops at $14,000.

An additional benefit would be the scrapping of the new condition that was applied to the house consent (which is a dubiously legal condition at best, so I've been informed), which required that we do the roadworks before pouring the footings on the house. Under this new plan (which is a lot like the old one) we can do most of the house before having to worry about roadworks.

So I keyed a letter off to our certifier to request clarification on all of our understandings and intuitions, and now await a reply from both people. Whilst I wait I'm left to ponder the situation. Perhaps there is something we haven't achieved that we should have, and so we are being sent in circles until that achievement is made? The universe, by way of a friend, was kind enough to supply us with building materials, tools and other goodies on the weekend, so it's still looking after us, there's little doubt about that. There must be other processes in motion, things happening behind the scenes that need to catch up and arrive at a particular point for us to move onward.

So, depending on the answer to my email and phone calls, we might not be proceeding with locating the shed in the spot that we've picked out and done work to clear up. Not such a bad thing perhaps, though I've now got to go back to the drawing board and pick another spot (more than 15m from any boundaries IIRC). Tricky on our hilly country, but as you might have guessed, I don't mind a challenge, though I'd prefer it if it wasn't the same challenge over and over and over again...

Monday, 13 July 2009

The Party & The Cleanup

The big birthday party was a bit of a success. I spent the Friday afternoon and evening cooking up some treats and preparing the meat, so on the day we started with profiteroles, then had lunch of fennel pork belly and roast vegetables, following that with a birthday cake (fudge chocolate with vienna filling and icing and a bit of blackberry jam) and a piece of lemon meringue pie (sadly the lemon bit was runny, but it was still edible). We all enjoyed the time together, the weather was nice enough, not the sunny days of the week before, it was overcast and a bit chilly, but still nice all the same. All in all a top event!

After the main festivities were completed we sat around the campfire into the early evening, roasting marshmallows with the kids until their bedtime, then it was quiet time with the brother, listening to some old hits on the local radio station, sampling some red wine, singing to the better tunes. Campfire time was cut short when "I can't stand the rain" began to play, and, inevitably, it began to rain.

Sunday dawned cloudy, and after a suitable period of morning recuperation I packed up copious amounts of hot water for coffee and set off to the new land, hoping to get through most of the preparatory work needed in getting the shed site ready to go.

Shed site before. It is going to sit across the picture, and the bins further
back will impinge upon it's footprint. The fence to be removed runs from the
second post on the right across the picture to the left.


Started out with measuring up the location for the shed according to the submitted plans. I'd made a couple of last minute on-paper changes to the location to accommodate some other tentative future plans, so I needed to know where the shed was really going to go. Once this was sorted out it was on to removing the small fence that formed the back boundary of the shed yard. As the first picture shows, there's also a lot of materials stored in the region of the shed site. Once the fence was down all of these needed to be moved, which was the largest part of the job. There must have been a couple of ton of steel in there at least.

Shed site after. The fence is gone and all the resources are moved into a neat stash
out of the way. You can just make out, if your eyes are sharp, some white posts,
far left cutting across the shadow, in front of the right-most bin, and then a
couple more cunningly hidden on the mid-right.


Amazingly I made it through it all, and had time to chop a small load of wood before dark. Then it was off for home again. The next major action on the shed project should be getting the earthworks done, which will most likely involve a bit of (internal) road building as well.

Below is a picture, for no particular reason at all, of the wonderful old sawmill we were gifted with. It's going to need a bit of work before it runs again though... Nice old piece of machinery all the same.